Home

Promo

Get Quo

Post Project

Company Promotions

Check Out LATEST RENOVATION Promotions and SAVE UP MORE on your RENOVATION COST!

1 BATHROOM PACKAGE @ $10,888 (HDB)

1 BATHROOM PACKAGE @ $10,888 (HDB)

Ministry of Renovation

How does this works?

  1. Register a “Homeowner account” on the Ministry of Renovation (MOR) website portal (www.mor.sg).
  2. Click on the “Get Promo” Button on this screen and type “1BPKG” and Sent.
  3. Alternatively, you can also WhatsApp : “1B PKG” to “9092 0775”.
  4. MOR Designer will get in touch with you within the next few working days.

Log on to : www.mor.sg

1 Bathroom Package @ $10,888 (HDB)

-PRELIMINARIES

  1. Submission to HDB for Hacking, Replacement of windows, ETC. (Exclude Professional Engineer (PE) if require by HDB)
  2. To provide labour / material for General Cleaning to 1 Bathroom
  3. Clearing of Debris, Supply of Sand, Upload of materials
  4. Floor protection by corrugated fibreboard
  5. Not include 3D drawings on carpentry
  6. Submission Licence Plumber (LP) Endorsement to PUB

-HACKING & DEMOLITION WORKS

  1. Hack off existing floor and wall tiles at 1 Toilet
  2. Dismantle 1nos. of existing 1 Toilet Door
  3. Hack off existing toilet Water Closet (WC), Wash Basin (WB), Water heater and Accessories at 1 Toilet

-MASONRY WORKS

  1. To supply labour & material to lay 2-Step K-11/104 water proofing at Master Bathroom Floor
  2. To supply labour to do cement screeding for Master Bathroom Floor
  3. To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy duty homogeneous tiles at Master Bathroom.
  4. Supply Labour to do cement screeding for Master Bathroom Wall
  5. To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles at Master Bathroom.
  6. Construct Entrance kerb/Step Down/Ramp at Master Bathroom Entrance

-PLUMBING WORKS

  1. Supply labour to install Stainless Steel piping (Cold) at 1 Toilet
  2. Supply labour to install 1nos of Instant heater
  3. Supply labour to install toilet accessories at 1 bathroom
  4. Supply labour to install 1nos of WC in 1 Bathroom
  5. Supply labour to install 1nos of Basin and Taps in 1 Bathroom (w/o cabinet)
  6. Supply labour to install 1nos of Spray Gun in 1 Bathroom

-ALUMINIUM

  1. Fabricate and install 1nos of (L) 3 FT X (H) 7 FT Bi-Fold Door in Master Bathroom

-PAINTING

  1. Supply labour and materials using NIPPON PAINT to paint 1 Toilet Ceiling

-Professional Consultation Fee

  1. MOR Professional Consultant Fee (Design Consultation + Project Documentations + All Warranties Support)

Terms and Conditions:

  1. This package is strictly Not allow to combine with other promotion.
  2. In the event of additional items during the renovation, “Service Fee” is chargeable for the renovation.
  3. Consultant Fee and Service Fee will base on MOR Plan template.
  4. Package does not include:
    • items not state in the Package
    • Public Liability Insurance
  5. If Owner is staying in and require pro-rate renovation, the cost will be increase by:
    • $1,200 for 2 Pro-rate
    • $1,800 for 3 Pro-rate
  6. Ministry of Renovation reserves the rights to change or amend the above terms & conditions without prior notice.

Promotion ends on 31 Dec 2023.

Copyright © 2021 Ministry Of Renovation. All rights reserved.

Chat on WhatsApp