Check Out LATEST RENOVATION Promotions and SAVE UP MORE on your RENOVATION COST!

KITCHEN 2 BATHROOMS PACKAGE @ $39,888 (HDB)

KITCHEN 2 BATHROOMS PACKAGE @ $39,888 (HDB)

Ministry of Renovation

How does this works?

  1. Register a “Homeowner account” on the Ministry of Renovation (MOR) website portal (www.mor.sg).
  2. Click on the “Get Promo” Button on this screen and type “K2BPKG” and Sent.
  3. Alternatively, you can also WhatsApp : “K2B PKG” to “9092 0775”.
  4. MOR Designer will get in touch with you within the next few working days.

Log on to : www.mor.sg

Kitchen 2 Bathrooms Package @ $39,888 (HDB)

-PRELIMINARIES

  1. Submission to HDB for Hacking, Replacement of windows, ETC. (Exclude Professional Engineer (PE) if require by HDB)
  2. To provide labour / material for General Cleaning to Kitchen 2 Bathrooms
  3. Clearing of Debris, Supply of Sand, Upload of materials
  4. Floor protection by corrugated fibreboard
  5. Provide 3D for on Carpentry (Max 1 drawing)
  6. Submission Licence Plumber (LP) Endorsement to PUB

-HACKING & DEMOLITION WORKS

  1. Hack off existing floor and wall tiles at Kitchen and 2 Toilets
  2. Dismantle 2nos. of existing 2 Toilets Doors
  3. Hack off existing toilet Water Closet (WC), Wash Basin (WB), Water heater and Accessories at 2 Toilets
  4. Dismantle all Kitchen Cabinet, Kitchen Sink, Hood and Hob at Kitchen

-MASONRY WORKS

  1. Construct kitchen mortar base complete with Side tiling works
  2. Construct fridge base complete with Full tiling works
  3. To supply labour & material to lay 2-Step K-11/104 water proofing
  4. To Supply Labour to do cement screeding for Kitchen Floor
  5. To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy duty homogeneous tiles at kitchen.
  6. Supply Labour to do cement screeding for Kitchen Wall
  7. To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles at Kitchen Wall.
  8. To supply labour & material to lay 2-Step K-11/104 water proofing at Master Bathroom Floor
  9. To supply labour to do cement screeding for Master Bathroom Floor
  10. To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy duty homogeneous tiles at Master Bathroom.
  11. Supply Labour to do cement screeding for Master Bathroom Wall
  12. To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles at Master Bathroom.
  13. Construct Entrance kerb/Step Down/Ramp at Master Bathroom Entrance
  14. To supply labour & material to lay 2-Step K-11/104 water proofing at Common Bathroom Floor
  15. To supply labour to do cement screeding for Common Bathroom Floor
  16. To supply labour and materials to lay floor tiles using (300mm x 300mm) heavy duty homogeneous tiles at Common Bathroom.
  17. Supply Labour to do cement screeding for Common Bathroom Wall
  18. To supply labour and materials to lay wall tiles using (300mm x 600mm) Polished Design Ceramic tiles at Common Bathroom.
  19. Construct Entrance kerb/Step Down/Ramp at Common Bathroom Entrance

-CARPENTRY WORKS

  1. Design and fabricate (L) 10 Ft Bottom and (L) 10 FT Top Kitchen Cabinet c/w free soft close hinges for Cabinet Door

-SOLID SURFACE

  1. Supply labour & material to install Solid Surface at Kitchen Top c/w Back splash (10 FT)

-PLUMBING WORKS

  1. Supply labour to install Stainless Steel piping (Cold) at Kitchen and 2 Toilets
  2. Supply labour to install 2nos of Instant heaters
  3. Supply labour to install toilet accessories at both bathrooms
  4. Supply labour to install 2nos of WC in Both Bathrooms
  5. Supply labour to install 2nos of Basin and Taps in Both Bathrooms (w/o cabinet)
  6. Supply labour to install 2nos of Spray Gun in Both Bathrooms
  7. Supply labour to install 1 set of Kitchen Sink and Tap at Kitchen

-ALUMINIUM

  1. Fabricate and install 2nos of (L) 3 FT X (H) 7 FT Bi-Fold Door in Master & Common Bathrooms

-PAINTING

  1. Supply labour and materials using NIPPON PAINT to paint Kitchen and 2 Toilets Ceiling

-Professional Consultation Fee

  1. MOR Professional Consultant Fee (Design Consultation + Project Documentations + All Warranties Support)

Terms and Conditions:

  1. This package is strictly Not allow to combine with other promotion.
  2. In the event of additional items during the renovation, “Service Fee” is chargeable for the renovation.
  3. Consultant Fee and Service Fee will base on MOR Plan template.
  4. Package does not include:
    • items not state in the Package
    • Public Liability Insurance
  5. If Owner is staying in and require pro-rate renovation, the cost will be increase by:
    • $1,200 for 2 Pro-rate
    • $1,800 for 3 Pro-rate
  6. Ministry of Renovation reserves the rights to change or amend the above terms & conditions without prior notice.

Promotion ends on 31 Dec 2023.